Properly replacing jaw crusher liner increases production efficiency by 40% et prolonge la vie des composants par 2-3 années. This comprehensive guide details professional techniques used insmall and large mining operations, couvrant les protocoles de sécurité, tool requirements, and precision alignment methods. Follow our 8-phase process to minimize downtime to under 4 hours per replacement.

Pre-Replacement Preparation
1. Safety Lockout Procedure
- Disconnect power supply and engage mechanical lockout
- Release hydraulic pressure (>5 minutes bleed time)
- Install fall protection for crusher pit access
2. Tool & Material Checklist
Tool | Specification |
---|---|
Hydraulic Jack | 50-ton capacity |
Torque Wrench | 300-800 Gamme n · m |
Liner Lifting Clamp | SWL 2,000kg |

Liner Replacement Process
3. Remove Worn Liners
- Loosen wedge bolts in diagonal pattern (30% torque reduction)
- Utiliserliner removal tools to break corrosion bond
- Extract upper wedges first, then side plates
4. Clean & Inspect Mounting Surface
- Remove debris with pneumatic chisel
- Check for cracks using dye penetrant
- Verify flatness (<0.5mm/m tolerance)
5. Install New Liners
Component | Torque Spec | Sequence |
---|---|---|
Mâchoire fixe | 650 N·m | Center-out |
Movable Jaw | 720 N·m | Cross pattern |
6. Alignment Verification
Use laser alignment tools to ensure:
- Parallelism <0.2mm/m
- Vertical runout <0.3mm
- Propercrushing chamber geometry

Post-Installation Procedures
7. Run-in Process
- Start with 50% feed rate for 2 heures
- Monitor vibration (<4.5 mm/s RMS)
- Retorque after 8 hours operation
8. Documentation & Analysis
- Record liner serial numbers
- Measure initial wear pattern
- Updatepredictive maintenance schedule
Common Mistakes & Solutions
Error | Consequence | Prévention |
---|---|---|
Improper torque | Liner movement | Use calibrated wrench |
Missed alignment | Premature wear | Laser verification |

Quarry Productivity Improvement
A limestone operation reduced liner replacement time from 6.5 pour 3.8 hours by:
- Implementing our 8-step process
- Using optimized liner profiles
- Training crew on crusher kinematics

Essential Tools for Efficient Replacement
- Liner handler with vacuum lift
- Infrared thermal camera (check bearing temps)
- Digital thickness gauge (wear measurement)
Precision Saves Costs
Replacing jaw crusher liner requires understanding torque specifications, alignment tolerances, and proper run-in procedures. Donc, by integrating this guide with your preventive maintenance program andequipment documentation, operations typically achieve 18-24 month liner lifecycles even in abrasive conditions.
Bureau du siège social
WhatsApp:+8615225176731
E-mail: [email protected]
Adresse: Non. 1688, Gaoke East Road, Nouveau quartier de Pudong, Shangai, Chine.
Site Internet: https://www.mill-sbm.com/
Contenu des articles
Messages récents
- Crusher à mâchoire pour le traitement du calcaire: Un guide de l'efficacitéComme le calcaire est largement utilisé dans la construction et l'industrie, Son traitement nécessite un broyeur de mâchoire solide et durable pour répondre aux besoins de l'industrie. Parmi les nombreux concasseurs, La mâchoire…
- Impact Crusher avec 300 TPH pour les grands projetsLorsque les géants miniers font face à des montagnes de minerai de fer ou de démolitions urbaines, génèrent des avalanches en béton, 300 TPH Impact Crusher apparaît comme des titans de transformation des matériaux. Au-delà des spécifications de base, Nous disséquons comment ces industriels…
- Broyeur à impact abordable: Un changement de jeu pour les petites entreprises de constructionLes petites entreprises de construction sont souvent confrontées à des contraintes budgétaires, pourtant besoin d'équipement fiable – Un concasseur à impact abordable. Ce broyeur peut combler l'écart, fournir un traitement de matériaux efficace sans un énorme capital…