Гэр » Блог » Эрүүний crusher Liners-ийг солих алхам алхам: 8 Түлхүүр үе шатууд

Эрүүний crusher Liners-ийг солих алхам алхам: 8 Түлхүүр үе шатууд

Properly replacing jaw crusher liner increases production efficiency by 40% мөн бүрэлдэхүүн хэсгийн амьдралыг үргэлжилдэг 2-3 жил. This comprehensive guide details professional techniques used insmall and large mining operations, Аюулгүй ажиллагааны протоколыг хамарна, tool requirements, and precision alignment methods. Follow our 8-phase process to minimize downtime to under 4 hours per replacement.

Эрүүний crusher Lueer
Эрүүний crusher Lueer

Pre-Replacement Preparation

1. Safety Lockout Procedure

  • Disconnect power supply and engage mechanical lockout
  • Release hydraulic pressure (>5 minutes bleed time)
  • Install fall protection for crusher pit access

2. Tool & Material Checklist

ToolSpecification
Hydraulic Jack50-ton capacity
Torque Wrench300-800 N·m range
Liner Lifting ClampSWL 2,000kg
Jaw Crusher Plates Replacement
Jaw Crusher Plates Replacement

Liner Replacement Process

3. Remove Worn Liners

  1. Loosen wedge bolts in diagonal pattern (30% torque reduction)
  2. Ашиглахliner removal tools to break corrosion bond
  3. Extract upper wedges first, then side plates

4. Clean & Inspect Mounting Surface

  • Remove debris with pneumatic chisel
  • Check for cracks using dye penetrant
  • Verify flatness (<0.5mm/m tolerance)

5. Install New Liners

ComponentTorque SpecSequence
Fixed Jaw650 N·mCenter-out
Movable Jaw720 N·mCross pattern

6. Alignment Verification

Use laser alignment tools to ensure:

Jaw Crusher Plates Replacement
Jaw Crusher Plates Replacement

Post-Installation Procedures

7. Run-in Process

  1. Start with 50% feed rate for 2 цаг
  2. Monitor vibration (<4.5 mm/s RMS)
  3. Retorque after 8 hours operation

8. Баримт бичиг & Analysis

Common Mistakes & Solutions

ErrorConsequencePrevention
Improper torqueLiner movementUse calibrated wrench
Missed alignmentPremature wearLaser verification
Jaw Crusher Of Small Mining Operations
Jaw Crusher Of Limestone Quarry

Quarry Productivity Improvement

A limestone operation reduced liner replacement time from 6.5 руу 3.8 hours by:

  1. Implementing our 8-step process
  2. Using optimized liner profiles
  3. Training crew on crusher kinematics
Jaw Crusher Liners
Jaw Crusher Liners

Essential Tools for Efficient Replacement

  • Liner handler with vacuum lift
  • Infrared thermal camera (check bearing temps)
  • Digital thickness gauge (wear measurement)

Precision Saves Costs

Replacing jaw crusher liner requires understanding torque specifications, alignment tolerances, and proper run-in procedures. Тиймээс, by integrating this guide with your preventive maintenance program andequipment documentation, operations typically achieve 18-24 month liner lifecycles even in abrasive conditions.

Төв оффис

Whatsapp:+8615225176731

Имэйл: [email protected]

Хаяг: Үгүй. 1688, Гаоке зүүн зам, Пудонг шинэ дүүрэг, Шанхай, Хятад.

Вэб сайт: https://www.mill-sbm.com/

Нийтлэлийн агуулга

Сүүлийн бичлэг

  • Алтан хүдрийн боловсруулалт: Эрүүний crusher үр ашиг
    Үр дүнтэй алтан хүдрийг нарийн бутлах үйл ажиллагаанд нугас боловсруулах, эрүүний бутлагчид Rugged хадгаламжийг оновчтой болгоход хүргэдэг. Эдгээр машинуудыг ажлын байрны ажлын байрыг эзлэхгүйгээр хэрхэн тохируулахыг олж мэдээрэй ...
  • Голын хайрыг эрүү бутлуураар бутлах
    Орчин үеийн барилгын ажилтнууд, Голын хайрга нь замд тэсвэртэй хатуужил, дасан зохицох чадварыг өгдөг, бетон, элэгдлийн хяналт. Гэсэн хэдий ч түүний хүргэн, Тогтмол бус шинж чанар нь эрүүний Бручинг тэвчихэд зориулж барьсан машин механизмыг шаарддаг. ...
  • Таны салбарт зориулж зөв эрүүний эрүүгийн хэрүүлийг хэрхэн сонгох вэ?
    Эрүү эрүүний crusher Crusher хэмжээг сонгох нь таамаглал биш юм. Энэ бол материаллаг динамик, үйл ажиллагааны тооцоолол юм. Хатуу рок олборлосон үйлдвэрүүд нь хот суурин газрын бетон дахин боловсруулах, Тэр ч байтугай ...